PONTE COMORO III
Ponte Comoro III realiza tamba kooperasaun entre Governu Japaun no Governu Timor-Leste, ne’ebe hetan tulun liu husi Ajensia Japaun nian ba Kooperasaun International (JICA), konstruksaun refere kaer husi Empreza Japaun ho Naran TOBISHIMA CORPORATION no Konsórsiu konsultór sira mak hanesan INGEROSEC CORPORATION, NIPON ENGINEERING CONSULTANT CO. LTD no IDEAS, Inc ho montante osan hamutuk ¥ 1.690.000.000,00 (Yen Japaun) konversi ba Dollar Amerikanu US$ 16.171.610,00.
Tuir planu kontruksaun refere durasaun tempu atu halo konstruksaun tinan rua komesa husi data 17 Outobru 2016 no remata 31 Agostu 2018. No hahu loke atu asesu movimentasaun transporte no komunidade iha data 13 de Setembru 2018. Konstruksaun foun ne’e ligasaun Parte sul Comoro (Raikotu, Golgota, Raihun, Bairo Moris foun) no parte norte Cidade Dili (Fumentu, Delta, Aimit-laran, Hudi-laran nst) no sai hanesan dalan alternativa hodi prevene problema engarrafamentu, promove atividade ekonómiku no kontribui ba dezenvolvomentu iha kapitál Dili.
Tipu ponte Comoro III Girder Box ho nia naruk 249 metrus no nia luan 12 metrus kumpletu ho paseiu husi norte mota ain ho luan 2 metrus no parte súl mota ulun ho luan 0.75 metrus. Tuir planu desainer ninian ponte ne’e durasaun atu rehabilita fila fali tinan 50 oin mai, sura husi 2018 to’o 2068 mak bele rehabilita fila fali.
Espesifikasaun ponte tipu girder box fahe ba parte rua mak hanesan substructure no Upperstucture.
- Substructure kompostu husi:
- Base of the Bridge (Abutment)
Back wall
Retaining wall
Wing wall
Oprit, stepping plate (Approach slab)
Short console for jacking (Corbel)
Bearing
- Bridge Plates (Pier)
Pillar head (Pier Head)
Pillar (Pier), in the form of a wall, column, or portal
Short console for jacking (Corbel)
Bearing
2. Upperstructure
Upperstructure mak parte ne’e simu todan direitamente kompostu husi Peso próprio, dead load, dead load infenta, vehicle traffic load, brake force no pedestrian load. Struktura leten geralmente kompostu husi:
Upperstructure mak parte ne’e simu todan direitamente kompostu husi Peso próprio, dead load, dead load infenta, vehicle traffic load, brake force no pedestrian load. Struktura leten geralmente kompostu husi:
- Sidewalks:
Backrest and backrest
Curb elevation
Slab on sidewalk floors.
- Slab of vehicle floor
- Girder,
- Diafragma beam
- Bearing
Ponte ne’e fahe ba pista hat (empat jalur) no diresaun rua Comoro Rai-hun no Delta, Hudi-laran (dua arah) unmedian. Bainhira Ponte laiha median (Unmedian) motorista sira halai kuidadu tamba risku liu kompara ho ponte Comoro II CPLP. Ponte Comoro III risku liu tamba hasoru malu ho kareta bo’ot halai kuidadu ka hatun velucidade se lae bele hetan acidente lalais. Eng. Ambrosio
Komentar
Posting Komentar